Moffitt Cancer Center McKinley Child Development Center

This project consists of the construction of a new 17,000-sf, one-story stand-alone child development center for Moffitt Cancer Center, in Tampa, Fla. The building is being constructed with an exterior masonry with stucco finish, metal stud interior framing, shingle roof



NAVFAC 250KW Diesel Generator Installation at the Fuel Farm

This project involves providing a new 250KW standalone diesel generator with sub-base fuel tank to serve the existing facilities at fuel farm located at US Naval Station in Mayport, FL. The Generator supplies emergency power to the existing motor control




Hillsborough County Sheriff’s Office Pinebrooke II Renovations

This project consists of the complete interior build-out of two police training facilities, an indoor firing range and a workout gym, both located at HCSO’s Pinebrooke II facility in Tampa, Florida. At completion, the new gym will feature 4,100-sf of




University of South Florida Palm Drive Boardwalk Replacement

This project consisted of the demolition of the existing decking from the boardwalk located on Palm Drive on USF’s main campus and the installation of 4,802 linear feet of anodized aluminum metal decking. This project was awarded under the University



Tampa International Airport Concessions – Tampa Bay Times

Foresight Construction Group was recently awarded with a 1,087-square-foot tenant build-out for Tampa Bay Times, a new concession located at Tampa International Airport, Tampa, FL. Our scope of work includes installing flooring, metal framing and drywall, painting, concrete and masonry, HVAC, plumbing,



Westport High School Auditorium and Stadium Renovation Upgrades

This multi-disciplined project included roofing, drywall, door frames and hardware, painting, HVAC, electrical, lighting, and sound system upgrades. The main mechanical scopes included the installation of a new auditorium lighting system and a new stadium sound system replacement. This project was awarded



Tampa International Airport Concessions – Timezone Shades

This project consisted of a 448-square-foot tenant build-out for Timezone Shades, a new concession located at Tampa International Airport, Tampa, FL. Our scope of work includes SS Metal Base & Trimming, Drywall, Flooring, Painting, Specialties, Fire Protection, Plumbing, Mechanical and Electrical.



Tampa International Airport Concessions – Newslink

Foresight Construction Group was recently awarded with a 873-square-foot tenant build-out for Newslink, a new concession located at Tampa International Airport, Tampa, FL. Our scope of work includes SS Metal Base & Trimming, Doors & Hardware, Drywall, Flooring, Painting, Specialties, Fire