NAVFAC POL B2109 Operations Facility Renovations

This project consists of multiple repairs and renovations at existing building 2109 POL Operations Building located at NAS Jacksonville, FL. Our scope of work includes the construction of a building addition on the east side of the Operations Building. The



JAA – Cecil Airfield Hangar Relocation

Foresight’s contract consists of the complete relocation of an 18,000-sf aircraft hangar and the construction a new 28,000-sf concrete slab for the new aircraft hangar. This is Foresight’s first major project with the Jacksonville Aviation Authority. The Jacksonville Aviation Authority



Moffitt Cancer Center McKinley Child Development Center

The project consisted of the construction of a new 17,000-sf, one-story stand-alone child development center, complete with parking lot, sidewalks and playground equipment.  The building features reception areas, lobby, art/enrichment room, “movement” room, classrooms, food prep and storage areas, child



NAVFAC 250KW Diesel Generator Installation at the Fuel Farm

This project involves providing a new 250KW standalone diesel generator with sub-base fuel tank to serve the existing facilities at fuel farm located at US Naval Station in Mayport, FL. The Generator supplies emergency power to the existing motor control




Hillsborough County Sheriff’s Office Pinebrooke II Renovations

For this project, Foresight was contracted to complete the interior build-out of two police training facilities, an indoor firing range and a physical fitness training facility, both located at the Hillsborough County Sheriff’s Office Pinebrooke II facility. Foresight’s scope of




University of South Florida Palm Drive Boardwalk Replacement

This project consisted of the demolition of the existing decking from the boardwalk located on Palm Drive on USF’s main campus and the installation of 4,802 linear feet of anodized aluminum metal decking. This project was awarded under the University



Tampa International Airport Concessions – Tampa Bay Times

Foresight Construction Group was recently awarded with a 1,087-square-foot tenant build-out for Tampa Bay Times, a new concession located at Tampa International Airport, Tampa, FL. Our scope of work includes installing flooring, metal framing and drywall, painting, concrete and masonry, HVAC, plumbing,



Westport High School Auditorium and Stadium Renovation Upgrades

This multi-disciplined project included roofing, drywall, door frames and hardware, painting, HVAC, electrical, lighting, and sound system upgrades. The main mechanical scopes included the installation of a new auditorium lighting system and a new stadium sound system replacement. This project was awarded