Construction of Comm Duct MSA 3 for U.S. Air Force/45th Contracting Squadron


This project entailed the provision of labor, equipment and materials to install an underground communications duct bank, communication pedestals with enclosures and (8) 8 ft. x 8 ft. manholes at 500’ O.C. The construction and installation of the new 4×4 concrete encased communications duct banks from the south end of MSA 3 tying in MSA 3 to the communications duct bank system.