Trident Wharf B-79150 Compressed Air Replacement for U.S. Navy/Naval Facilities Engineering Command (NAVFAC) Southeast Division

Client
NAVFAC Southeast
Market
Government - Federal
Location
Patrick Air Force Base, Cape Canaveral, Fla.
Service
General Contracting

The purpose of the project was to replace the existing shore side, ship service compressed air systems with new, economical, durable, efficient, and low maintenance compressed air systems. The scope of work included replacing existing air compressors with (2) new rotary screw air compressors; replacing common compressed air dryer with new refrigeration air dryer; replacing both compressor after-coolers; replacing all compressed air piping, manifolds, fitting, valves and accessories inside of building 79150, through roadway utility trench, to all utility access boxes on the Trident Wharf; and replacing all compressed air station manifolds in the wharf utility boxes.