University of Florida Chemistry Lab C309 HVAC Renovation


Our primary scopes of work included the demolition of four offices to incorporate into adjacent lab space along with major mechanical demolition and renovation. Modifications to the fire protection, electrical, and controls systems were also made in the affected areas. Protective control measures were extensive, including the construction of an enclosure built and assembled on-site to protect an existing laser table in the lab from construction impacts. The area within the enclosure was pressurized with clean air to prevent dust from migrating into the equipment.